Bridges

For more information, contact bridges@wai.com.

2013   Brooklyn Bridge - Approaches and Ramps Rehabilitation
Brooklyn, New York
NYC Department of Transportation
URS Corporation
Design for redecking 7 steel approach structures, ramp structures, and approach roadway on brick arches. Rehabilitation of substructure. In-depth inspection of bridge and towers.

2012   San Francisco-Oakland Bay Bridge - Suspension Bridge Design
San Francisco, California
California Department of Transportation (CALTRANS)
TY Lin/Moffatt & Nichol (JV); MacDonald Architects
Design of world’s longest single-tower, self-anchored suspension bridge; first in US. Largest earthquake load imposed on a bridge.
 
   Shore Parkway over Fresh Creek Basin
Brooklyn, New York
NYC Department of Transportation
WAI Prime
Resident engineering inspection services for reconstruction of two highway bridges, including demolition, approach widening and maintenance of traffic.
 
   Two Pedestrian Bridges
New York and Queens, New York
NYC Department of Design and Construction
WAI Prime; H2L2 Architects
Design and construction support services for reconstruction of two pedestrian bridges to increase capacity and ADA compliance and improve safety and aesthetics.

2011   Brooklyn Queens Expressway Environmental Impact Statement
Brooklyn, New York
NY State Department of Transportation
Henningson Durham & Richardson (HDR)
DR/EIS project scoping report for rehabilitation of 1.5-mile portion of expressway, including 3-level cantilevered structure. Design review; Environmental Impact Statement.

2009   Bronx-Whitestone Bridge - Deck Widening and Cable Replacement Study
Bronx, New York
MTA NYC Transit Authority/TBTA
Parsons Brinckerhoff Quade & Douglas/WAI (JV)
Conceptual designs for deck widening and cable replacement with analysis of their effects on bridge components, traffic flow, cost, and aesthetics.
 
   Manhattan Bridge - Lower Roadway Rehabilitation Design and Construction Support Services
New York, New York
NYC Department of Transportation
WAI Prime
Design and construction support for replacement of lower roadway, including framing, deck, substructure, anchorages, towers, lighting, fire standpipe, and traveler.
 
   Pitt River Bridge Vibrations Study
Vancouver, British Columbia, Canada
British Columbia Ministry of Transportaiton
West Wind Laboratory
Preliminary study of wind-induced vibrations of bridge stay cables; recommendations for mitigation with mechanical dampers..
 
   Tappan Zee Bridge Repairs Construction Inspection and Supervision (TANY 05-31B)
Tarrytown, New York
NY State Thruway Authority
WAI Prime
Engineering, inspection, and construction support for deck replacement. Traffic maintenance/protection, electrical system improvements, lighting. Shop drawing review and approval.
 
   Verrazano-Narrows Bridge - Rehabilitation of Lower Level and the Lily Pond Avenue Bridge
Staten Island, New York
MTA Bridges & Tunnels/TBTA
WAI Prime
Rehabilitation of lower-level approaches and Lily Pond Avenue overpass west of bridge toll plaza in Staten Island. Seismic evaluation and retrofit.

2008   Aerial Tramway - Tower and Anchorage Design
Philadelphia, Pennsylvania
Delaware River Port Authority
WAI Prime
Design of innovative aerial tramway connecting Philadelphia and Camden.
 
   Henry Hudson Parkway Northbound Service Road Guide Rails
Bronx, New York
NYC Department of Design and Construction
WAI Prime
Design for removal of existing fencing and guide rails and installation of new timber guide rails within specified area limits. Subsurface investigation; utilities.
 
   Metrorrey Light Rail Viaduct - Line 2
Monterrey, Mexico
Sistema de Transporte Colectivo Metrorrey
WAI Prime; Grupo GP Construction
Design-build for 4-mile-long elevated precast-concrete segmental viaduct, including design of platform structures for six elevated stations, for extension of light rail system.
 
   Roslyn Viaduct Bridge Replacement
North Hempstead, New York
NYS Department of Transportation
WAI Prime
Construction engineering for new precast segmental viaduct to replace existing bridge. Design of erection equipment and sequences, erection manual, geometry control.
 
   Triborough Bridge - Dehumidification and Reanchoring of Cable Strands
New York, New York
Triborough Bridge & Tunnel Authority
WAI Prime
Design of dehumidification system, re-anchoring of strands, condition survey for additional strands, anchorage rehabilitation, concrete and steel repairs.

2007   Bronx-Whitestone Bridge - Deck Replacement Design and Aerodynamic Study
Bronx, New York
MTA Bridges & Tunnels/TBTA
WAI Prime
Design of lighter steel orthotropic replacement deck essential to stiffening system. Coordination with design of wind fairings for aerodynamic enhancement.
 
   Cooper River Bridges Demolition
Charleston, South Carolina
South Carolina Department of Transportation
WAI Prime; Jay Cashman/Testa Corp (JV)
Demolition of four river crossings and approaches. Design of improved interchange, new pedestrian/bicycle bridge, and streets. Contaminated materials, wetlands protection.
 
   Moses Wheeler Bridge
Stratford, Connecticut
Connecticut Department of Transportation
STV Incorporated
Technical consultant for concept development and final design of 3,000-foot-long precast segmental concrete box-girder bridge carrying 6 lanes of I-95 over the Housatonic River.
 
   Queensboro Bridge - Construction Support Services (Contract #6)
New York, New York
NYC Department of Transportation
WAI Prime
Construction support services during rehabilitation of miscellaneous bridge components.
 
   Route 52 Causeway - Contract A PreBid
Ocean City, New Jersey
George Harms Construction Company/PKF
WAI Prime
Pre-bid assistance to contractor for $350 million replacement of bridge and causeway. Preliminary gantry designs, alternative erection schemes, revised segment configurations.
 
   St. George Ferry Terminal - Ramps
Staten Island, New York
NYC Department of Transportation
WAI Prime
In-depth inspection of 8 ramps and recommendations for rehabilitation. Survey, subsurface investigation, environmental testing, document review.
 
   Triborough Bridge - Reconstruction Inspection
New York, New York
Triborough Bridge & Tunnel Authority
The LiRo Group
Construction inspection services for reconstruction of bridge approaches, including redecking of plate girder superstructure and repair of substructure.
 
   Williamstown Bridge
Williamstown, Massachusetts
Massachusetts Highway Department
WAI Prime
Inspection of existing bridge and design of single-span post-tensioned replacement with new 15-meter deck and improved abutments, roadway, and signals.

2006   Becket Bridge
Becket, Massachusetts
Massachusetts Highway Department
WAI Prime
Design of bridge carrying Route 8 over Yokum Pond Brook to accommodate traffic requirements and high-water elevation; replacement for deteriorated structure with 45-degree skew.
 
   Biennial and Interim Bridge Inspection - 2005-2006
New York County, New York
NY State Department of Transportation
WAI Prime
Biennial and interim inspection of 201 short- and medium-span highway bridges (2,743 spans) in New York County.
 
   Congress Street Bridge
Brooklyn, New York
NYC Department of Transportation
WAI Prime
Resident engineering and inspection services for bridge rehabilitation, including confirmation of quality of all structural elements and traffic maintenance.
 
   FDR Drive Southbound - East 49th Street to East 42nd Street
New York, New York
NYC Department of Transportation
WAI Prime
Rehabilitation design for 2,100 linear feet of cantilevered highway with uncommon deterioration. Multiple surveys and geotechnical reports, resident engineering.
 
   Lincoln Road Bridge
Brooklyn, New York
NYC Department of Transportation
WAI Prime
Resident engineering and inspection services for bridge rehabilitation, including confirmation of quality of all steel, concrete elements, and traffic maintenance.
 
   Richmond-San Rafael Bridge Seismic Retrofit
San Francisco, California
California Department of Transportation (CALTRANS)
Tutor-Saliba/Koch-Skanska (JV)
Cost-effective design of temporary structures to stabilize existing piers during major seismic retrofit of 4.5-mile bridge over San Francisco Bay.
 
   Rikers Island Bridge
East Elmhurst, New York
NYC Department of Transportation
WAI Prime
Structural design for replacement of deck and superstructure of 3/4-mile viaduct with 56 spans.
 
   Sakonnet River Bridge Review
Newport, Rhode Island
Rhode Island Department of Transportation
Commonwealth Engineers and Consultants
Constructability and peer reviews of design for 1,950-foot precast-concrete segmental portion of new bridge between Portsmouth and Tiverton.
 
   Staten Island Ferry Transfer Bridges Inspection
Manhattan and Staten Island, New York
NYC Department of Transportation
WAI Prime
Biennial inspection of movable transfer bridges for 8 slips following NY State DOT format. Document review.
 
   Steinway Street Bridge Emergency Damage Assessment
Queens, New York
NYC Department of Transportation
WAI Prime; WAI Prime
Forensic investigation and condition inspection of collapsed bridge structure over Grand Central Parkway. Shop drawing review of temporary bridge.

2005   Brooklyn Bridge - Pedestrian Vibrations Study
Brooklyn, New York
NYC Department of Transportation
WAI Prime
Analysis of pedestrian-induced vibrations (synchronization) caused by unprecedented exodus from Manhattan during largest blackout in US history. Monitoring, testing, mitigation.
 
   Forth Bridge Cable Investigation
Edinburgh, Scotland, United Kingdom
FaberMaunsell Ltd of Maunsell House
WAI Prime
First-ever internal inspection of cables on 40-year-old suspension bridge.
 
   Iowa DOT I-74 Bridges - Cable Inspection
Bettendorf, Iowa
Iowa Department of Transportation
WAI Prime; Jacobs Engineering Group
In-depth inspection of cable system on twin suspension bridges over the Mississippi. Unwrapping and rewrapping of main cables wedged open for condition inspection.
 
   Mill Basin Bridge over Belt Parkway
Brooklyn, New York
NYC Department of Transportation
WAI Prime
Design-build services for redecking of double-leaf trunnion bascule bridge supporting 6-lane parkway over Mill Basin with sidewalk on each side.
 
   Queensboro Bridge - 2004 General Bridge Inspection
New York and Queens, New York
NY State Department of Transportation
HNTB Engineering and Architecture/WAI (JV)
General inspection of East River steel truss bridge connecting the boroughs of Queens and Manhattan.
 
   Red River Bridge Inspection
Boyce, Louisiana
Louisiana Department of Transporation
WAI Prime
Inspection and special nondestructive testing of concrete segmental main spans of cast-in-place box-girder bridge carrying Route LA 8 over the Red River.
 
   Staten Island Bridges
Staten Island, New York
NYC Department of Transportation
WAI Prime
Design of repairs for cracking in high-stress regions of 3 bridges carrying local roads over abandoned Staten Island Railroad.
 
   Tampa-Hillsborough Expressway
Tampa, Florida
Tampa Hillsborough County Expressway Authority
DMJM + Harris
Construction engineering for 12,000-foot-long viaduct made of precast segmental concrete box girders. Geometry control and erection manuals, casting software.
 
   Tappan Zee Bridge - Bulkheading, Sheet Piling and Shoreline Stabilization
Tarrytown, New York
NY State Thruway Authority
WAI Prime
Resident engineering for bridge improvements, including sheetpile and rock anchor installation and dock construction along Nyack shoreline adjacent to abutment.
 
   Tappan Zee Bridge - Construction Support
Tarrytown, New York
NY State Thruway Authority
WAI Prime
Construction review and approval for structural steel repairs to west deck truss spans and steel towers. Replacement of caisson dewatering system.
 
   Victory Bridge
Perth Amboy, New Jersey
New Jersey Department of Transportation
WAI Prime; George Harms Construction Company
Construction engineering services for twin 3,971-foot-long precast-concrete segmental bridges. Erection manual, erection sequencing, gantry load tests, equipment design drawings.
 
   Williamsburg Bridge - Tower Column Reinforcement Peer Review
Brooklyn and New York, New York
NYC Department of Transportation
WAI Prime
Technical peer review for main tower column strengthening; drawings, of proposed method, alternatives, erection, access, shielding, constructability.
 
   Williamsburg Bridge Deck Joints
New York, New York
NYC Department of Transportation
WAI Prime
Investigation of expansion joints on bridge bikeway that caused problems for cyclists and pedestrians. Design of steel plates to cover joints. Results praised by community board.

2004   Biennial and Interim Bridge Inspection - 2003-2004
New York County, New York
NY State Department of Transportation
WAI Prime
Biennial and Interim inspections of 199 highway bridges (2,736 spans) in New York County (Manhattan).
 
   Bronx-Whitestone Bridge - Wind Fairings
Bronx, New York
MTA Bridges & Tunnels/TBTA
WAI Prime
Major reconstruction of 2,300-foot main span to improve aerodynamic stability and reduce excessive dead load strain on cable. Largest civil application of composites to date.
 
   Brooklyn Queens Expressway - Highway and Bridge Design
Queens, New York
NY State Department of Transportation
Vollmer Associates
Reconstruction and rehabilitation of 4 bridges over expressway in northwestern Queens County. Seismic analysis.
 
   I-93 Charles River Bridge Demolition
Boston, Massachusetts
Massachusetts Highway Department
WAI Prime
Step-by-step analysis and planning for environmentally safe controlled demolition of double-deck, through truss bridge next to new bridge. Coordination with owner and contractors.
 
   Manhattan Bridge - Bikeway
New York, New York
NYC Department of Transportation
WAI Prime
Design of access ramps and dedicated bicycle path across Manhattan Bridge. New railing, fences, drainage, lighting, traffic control devices, signage.
 
   Manhattan Bridge - East Side Rehabilitation Design and Seismic Retrofit
New York, New York
NYC Department of Transportation
WAI Prime
Final phase of East Side main-span rehabilitation, including torsional stiffening of suspended spans, reconstruction of approach roadway framing, replacement of lower roadway.
 
   Manhattan Bridge - North Span Rehabilitation Design and Construction Support
New York, New York
NYC Department of Transportation
WAI Prime
Design and construction support for completion of north span rehabilitation. Replacement of subway framing, stringers, upper roadway deck; stiffening of main span; bikeway.
 
   NCHRP Parallel-Wire Bridge Cable Guidelines
Washington, DC
National Academy of Sciences
WAI Prime
Comprehensive guidelines for inspection and evaluation of the condition, strength, and safety of suspension bridge cables. Published with comprehensive report .
 
   Route LA 319 Drawbridge / Louisa Bridge
Port of West St. Mary, Louisiana
Louisiana Department of Transportation
HNTB
Investigation of failure of temporary supports of bascule leaf during erection. Evaluation of damage to bascule girder, counterweight box, tension supports. Repair recommendations.
 
   Shark River Bridge
Belmar, New Jersey
NJ Department of Transportation
WAI Prime; AMEC Construction
Design of deep-braced cofferdams for construction of 3 piers that support a high-level crossing of Route NJ 35; addressed surge tides and 8-knot currents.
 
   SR 9A / I-95 / I-295 Interchange
Jacksonville, Florida
Florida Department of Transportation
WAI Prime
Construction engineering services for urban interchange consisting of 3 precast segmental concrete box-girder bridges. Equipment design, erection manual, on-call services.
 
   Waldo-Hancock Bridge Cable Evaluation
Bucksport, Maine
Maine Department of Transportation
WAI Prime
Cable investigation of Maine's first suspension bridge to determine whether bridge needed to be replaced.
 
   Williamsburg Bridge and Brooklyn Bridge - Peer Review of Seismic Evaluation
New York, New York
NYC Department of Transportation
WAI Prime
Peer review of proposed seismic retrofit schemes with recommendations for alternate schemes based on latest NYCDOT seismic design criteria guidelines for critical bridges.

2003   Benjamin Franklin Bridge - Cable Strengthening Alternatives
Philadelphia, Pennsylvania
Delaware River Port Authority
WAI Prime
Multi-disciplinary feasibility study and conceptual design of cable-strengthening alternatives; effects on other bridge components, traffic flow, cost, and aesthetics.
 
   Fairhaven Bridge (F-01-014-3T7)
Fairhaven, Massachusetts
Massachusetts Highway Department
WAI Prime
Forensic investigation of prestressed-concrete box-beam deck bridge to determine causes of deflection and negative camber in various beams. Field and laboratory testing.
 
   LIE and Clearview Expressway Interchange - Replacement Design of Six Bridges
Queens, New York
NY State Department of Transportation, Region 11
WAI Prime
Inspection and rehabilitation design for 6 single- and multi-span bridges at major expressway interchange. Construction support, hazardous materials management.
 
   Logan International Airport - New International Gateway Terminal E
Boston, Massachusetts
Massport
Skidmore Owings & Merrill
Structural, seismic, and blast analysis and design for terminal addition with deep foundations. Design of third-level roadway and connecting vehicle exit ramp.
 
   Manhattan Bridge - North Span Interim Repairs and Construction Support
New York, New York
NYC Department of Transportation
WAI Prime
Construction support, design services, and special instructions for rehabilitation of north spans of Manhattan Bridge, including emergency repairs.
 
   Marcy Pedestrian Bridge - Forensic Investigation
Marcy, New York
NYS Department of Transportation
WAI Prime
Forensic investigation of pedestrian bridge that collapsed during construction. Field research, design and code compliance review, sample testing, structural analysis, report.
 
   Matthews Bridge - PD&E Study
Jacksonville, Florida
Florida Department of Transportation
Reynolds Smith & Hills
Assessment of remaining life of bridge and cost of rehabilitation to increase design capacity. Conceptual design for replacing with suspension bridge or supplementary span.
 
   Tappan Zee Bridge - Partial Deck Replacement
Tarrytown, New York
NY State Thruway Authority
WAI Prime
Resident engineering services for partial deck replacement at west approach truss spans. Miscellaneous repairs.
 
   TBTA Cable Wire Research
New York, New York
Triborough Bridge & Tunnel Authority
WAI Prime
Study to test and evaluate galvanized wires subject to corrosion within the cable systems of 4 suspension bridges. Predictive model; protection recommendations.
 
   Walt Whitman Bridge - Cable Investigation and Rehabilitation
Philadelphia, Pennsylvania
Delaware River Port Authority
WAI Prime
Cable wedging to evaluate number of degraded wires and analysis to determine cable strength. Humidity assessment, implementation of improvements.

2002   Acoustic Monitoring of Bridge Cables
New York, New York
Departments of Transportation
WAI Prime
Determination of rate and location of cable-wire failures with acoustic monitoring to improve inspection site selection.
 
   Biennial and Interim Bridge Inspection - 2001-2002
Kings and Richmond Counties, New York
NY State Department of Transportation
WAI Prime
Biennial and interim inspection of 393 highway bridges (1,723 spans) in Kings and Richmond Counties.
 
   Bridgewater, South Hadley, Belchertown Bridges
Multiple Cities, Massachusetts
Massachusetts Highway Department
WAI Prime
Condition assessment of 3 bridges with 124-foot spans constructed in 1931. Bridge rating, repair detail options. Cast-in-place concrete T-beams.
 
   Chesterfield Bridge
Chesterfield, Massachusetts
Massachusetts Highway Department
WAI Prime
Inspection and rating evaluation of reinforced-concrete bridge carrying 2 lanes of traffic over Jackson Brook.
 
   Holden Bridge
Holden, Massachusetts
Massachusetts Highway Department
WAI Prime
Inspection and rating evaluation of 3-span concrete bridge carrying 2 lanes of traffic over Quinapoxet River.
 
   Logan International Airport - Elevated Walkways
Boston, Massachusetts
Massport
Cambridge Seven Associates
Phased construction of aluminum-clad elevated pedestrian walkways and circulation nodes. Selective demolition and reconstruction of terminal structures.
 
   Lunenburg Bridge
Lunenburg, Massachusetts
Massachusetts Highway Department
WAI Prime
Inspection and rating evaluation of reinforced-concrete bridge carrying 2 lanes of traffic over Pearl Hill Brook.
 
   Somerset/Swansea Bridge
Sometset/Swanwea, Massachusetts
Massachusetts Highway Department
WAI Prime
Inspection and rating evaluation of bridge carrying 2 lanes of Route 103 over Lees River.
 
   Stockbridge Bridge
Stockbridge, Massachusetts
Massachusetts Highway Department
WAI Prime
Inspection and rating analysis of 1850 stone masonry arch bridge over Marsh Brook.

2001   Attleboro Bridge
Attleboro, Massachusetts
Massachusetts Highway Department
WAI Prime
Inspection and rating evaluation of 1850 bridge carrying 2 lanes of Route 152 over Ten Mile River.
 
   Biennial and Interim Bridge Inspection - 1999-2000
New York County, New York
NY State Department of Transportation
Baker Engineering Inc
Biennial and interim inspection of 210 short- and medium-span highway bridges (2,810 spans) in New York County.
 
   Brooklyn Bridge - 2000-2001 Biennial Inspection
New York, New York
NY State Department of Transportation
WAI Prime
Biennial inspection of East River suspension bridge between Manhattan and Brooklyn abutments during major rehabilitation of north and south roadways
 
   Casciano Memorial Bridge
Newark, New Jersey
New Jersey Turnpike Authority
WAI Prime
Removal of 2 suspenders for testing and replacement with new ones, to determine suspension system viability of tied-arch bridge, including testing and report.
 
   Dennis Bridge
Dennis, Massachusetts
Massachusetts Highway Department
WAI Prime
Emergency repair to 7-span, 2-structure bridge with damaged piles that did not compromise capacity. Inspection and load rating.
 
   FDR Drive Ramps - Interim Repairs
New York, New York
NY State Department of Transportation, Region 11
WAI Prime
Design of replacement for deteriorated wood shoring installed to support long-term temporary prestressed-concrete ramps between 26th and 38th Streets.
 
   Newark Liberty International Airport - Helical Ramps for Lot E Parking Structure
Newark, New Jersey
Port Authority of New York & New Jersey
WAI Prime
Design of helical ramps and spurs for new 800-car parking structure at Newark Liberty International Airport.
 
   Newark Liberty International Airport - Parking Lot E (P4) Bridge
Newark, New Jersey
Port Authority of New York & New Jersey
WAI Prime
Design of new precast concrete beam bridge near Terminal C (under On Call civil and structural engineering contract).

2000   Brooklyn Bridge - Deck Replacement
New York, New York
NYC Department of Transportation
WAI Prime; Yonkers Contracting Company
Emergency redecking of suspended spans, rehabilitation of 200 floor beams. Design, traffic maintenance, resident engineering, construction management. Fast track, design-build.
 
   Denver Millennium Footbridge Peer Review
Denver, Colorado
City and County of Denver
Ove Arup & Partners
Peer review of new cable-supported steel-and-concrete pedestrian bridge with heavy complicated structure, featuring a tapered, inclined 200-foot tubular steel mast.
 
   Phillipston, Taunton and Holyoke Bridges
Multiple Cities
Massachusetts Highway Department
WAI Prime
Inspection, rating, and repair of 3 bridges.
 
   Rockefeller University - Campus Community Bridge and Peggy Rockefeller Plaza
New York, New York
Rockefeller University
WAI Prime (Wendy Evans Joseph Architect)
First cable-stayed pedestrian bridge in New York City, connecting dormitories to main campus and spanning busy 63rd Street entrance to FDR Drive. Landscaped plaza.
 
   Tappan Zee Bridge - Pier Protection System Replacement
Tarrytown, New York
NY State Thruway Authority
WAI Prime
Design, resident engineering, construction inspection services for protection system replacement; pile-supported platforms at main towers, new permanent bulkhead at shoreline.
 
   Throgs Neck Bridge - Approach Deck Superstructure Rehabilitation Design
New York, New York
MTA Bridges & Tunnels/TBTA
WAI Prime
Remediation design for connections of retrofitted orthotropic deck to original steel approach structures that were cracking and had failed.
 
   Van Wyck Expressway - Rehabilitation of Railroad Bridges
Queens, New York
NY State Department of Transportation
WAI Prime
Inspection and preliminary design for maintenance repairs on 4 railway bridges spanning expressway.

1999   Brooklyn Bridge - Franklin Square Bridge Retrofit
New York, New York
NYC Department of Transportation
URS Grenier Woodward Clyde
Aesthetic retrofit of Roebling structure with structural steel arches to support overloaded original trusses without altering them. Seismic analysis and rating.
 
   Manhattan Bridge - West Side Approaches and Suspended Spans Rehabilitation Design
New York, New York
NYC Department of Transportation
Edwards and Kelcey
Rehabilitation of west side approaches and suspended spans, one of several large contracts for bridge carrying 7 vehicular lanes and 4 rapid transit tracks.
 
 
© 1996-2009 WEIDLINGER ASSOCIATES® INC All Rights Reserved | Trademark Statement | Website by Spliteye | Printer-Friendly Page