Infrastructure : GeoStructural Engineering

For more information, contact infrastructure@wai.com.

2006   191st Street Tunnel
New York, New York
NYC Department of Transportation
WAI Prime
Construction support services for 191st Street tunnel at Seventh Avenue.
 
   Central Artery C17A6 - I-93 Kneeland Street to Charles River
Boston, Massachusetts
Massachusetts Turnpike Authority
Modern Continental
Structural and geotechnical engineering for construction of 2 new 1,250-foot-long mainline cut-and-cover tunnels, including viaduct demolition and surface restoration.
 
   Harvard University - Laboratory for Integrated Sciences and Engineering (LISE)
Cambridge, Massachusetts
Harvard University
East Coast Slurry Company
Slurry wall for Harvard's first laboratory for interdisciplinary nanoscience research and incubator for scientific innovation. Two-thirds of structure underground.

2005   Central Artery D18A1 - I-93 Congress to Kneeland (Southbound)
Boston, Massachusetts
Massachusetts Turnpike Authority
Edwards & Kelcey/WAI (JV)
Improvement of highway tunnel under Dewey Square to meet current interstate highway standards. New tunnel construction of 300 feet.
 
   Harvard University - Oxford Street Garage
Cambridge, Massachusetts
Harvard University
Arrowstreet
Award-winning 5-level, below-grade 650-car garage in new campus area. Top-down construction, designed to accommodate future building above.
 
   US Capitol Visitor Center
Washington, DC
Architect of the Capitol
RTKL Associates
Geotechnical services for 3-level, 50-foot-deep excavation with combined footprint of approximately 250,000 square feet.

2004   MBTA Transitway - Silverline Tunnel Slurry Wall
Boston, Massachusetts
Massachusetts Bay Transportation Authority
JF White
Design of support of open-cut-excavation slurry wall system, 120 feet wide and 55 feet deep. For tunnel built under soft-clay conditions.

2003   60 Oxford Street Soil Mix Wall
Cambridge, Massachusetts
Harvard University
WAI Prime; ICOS Corp of America - TreviIcos
Design of soil mix wall to support temporary excavation for 31-foot-deep underground structure. Finite-element analysis for shared-wall construction sequence.
 
   Central Artery C15A1 - North to Chardon Streets
Boston, Massachusetts
Massachusetts Turnpike Authority
JF White/Slattery/Perini (JV)
Temporary decking and support of open-cut excavation for construction between North and Chardon Streets. Jacking sequence for underpinning of elevated artery. VECP finite analysis.
 
   Central Artery C15A2 - Northbound and Southbound Tunnels
Boston, Massachusetts
Massachusetts Turnpike Authority
WAI Prime; Cashman/Kiewit/Atkinson (JV)
Temporary support of excavation and temporary street decking to accommodate permanent Central Artery tunnels and maintain traffic flow. Slurry wall construction.
 
   Eleventh Avenue Underpass Slurry Wall
Nampa, Idaho
Idaho Department of Transportation
WAI Prime
Monitoring of slurry wall construction for highway-widening under railroad tracks, including constructability review and approval of procedure variations due to site conditions.
 
   Merck Research Center Construction
Boston, Massachusetts
Merck & Company
ICOS Corp of America - TreviIcos
Construction engineering for temporary structures, bracing, crane support, and slurry walls for 5-level underground parking. Modified top-down construction.
 
   MIT - Stata Center Excavation
Cambridge, Massachusetts
Massachusetts Institute of Technology
WAI Prime
Slurry wall and support of excavation design for contractor.

2002   Cambridge Research Park Garage
Cambridge, Massachusetts
LYME Properties
William A Berry & Son
Four-level parking garage to support hotel, apartment, and office buildings. First-ever Geo-Jet retaining wall installed on East Coast.
 
   Central Artery C01B1 - Vent Building #5 Superstructure
Boston, Massachusetts
Massachusetts Turnpike Authority
Chisholm Washington Architects
Design of building to house supply and exhaust fans for buried tunnel section that runs beneath it. Coordination with tunnel designers. BOCA 1993 seismic requirements.
 
   Central Artery C17A3 - Vent Building #3
Boston, Massachusetts
Massachusetts Turnpike Authority
FST/HNTB (JV)
Design of ventilation building.
 
   Central Artery C18A2 - Air Intake Structure
Boston, Massachusetts
Massachusetts Turnpike Authority
Edwards & Kelcey/WAI (JV)
Mechanical/electrical building constructed over existing tunnel south of Congress Street, phased with CA/T D018A1 Dewey Square tunnel renovation.
 
   MWRA FRSA Shaft
Weymouth, Massachusetts
Massachusetts Water Resource Authority (MWRA)
ICOS Corp of America - TreviIcos
Design of temporary steel casing for Fall River Shipyard Area (FRSA) access shaft to serve as temporary support of excavation during tunnel construction.
 
   Waste Water Treatment Cofferdam
Warwick, Rhode Island
City of Warwick Sewer Authority
WAI Prime
Design of slurry walls for 2 cofferdams, each 80 feet in diameter and 58 feet deep.

2001   Central Artery C11A1 - I-93 Northbound Tunnel (Atlantic Avenue)
Boston, Massachusetts
Massachusetts Turnpike Authority
WAI Prime; Perini/Kiewit/Cashman (JV)
Construction engineering and advanced soil/structure analysis of excavation support for more than 2,000 linear feet of tunnel using slurry diaphragm walls on sensitive site.
 
   Life Science Building GeoJet Wall
Cambridge, Massachusetts
Harvard University
ICOS Corp of America - TreviIcos
Design of economical earth support system using GeoJet (soil-mix) wall for temporary support of excavation with minimal impact on adjacent structures. Finite-element analysis.
 
   Ohio State - Horseshoe Stadium Slurry Wall
Columbus, Ohio
Ohio State University
Osborn Architects & Engineering
Design of cantilevered slurry wall for renovation of 75-year-old Horseshoe Stadium.
 
   One Lincoln Street Slurry Wall
Boston, Massachusetts
Gale & Wentworth
WAI Prime; ICOS Corp of America - TreviIcos
Design of perimeter slurry walls and cross-lot bracing for 55-foot-deep excavation of underground parking structure built next to old brick buildings.
 
   Russia Wharf Settlement Analysis
Boston, Massachusetts
Massachusetts Bay Transportation Authority
WAI Prime; Modern Continental
Field inspection and finite-element study of effect of CA/T and MBTA excavations on historic complex structure due to depressurization of glacial till and blue clay soil stratum.

1999   Central Artery C09A4 - Ramp D Thrust Pit Slurry Wall
Boston, Massachusetts
Massachusetts Turnpike Authority
Slattery Interbeton/JF White/Perini (JV)
VECP for thrust pit resulting in change of design to post-tensioned slurry wall and long-span space truss as wall bracing elements.
 
   Central Artery C09A4 - Ramp L Tunnel
Boston, Massachusetts
Massachusetts Turnpike Authority
Slattery Interbeton/JF White/Perini (JV)
VECP for tunnel in Fort Point Channel. Change of design to slurry wall, top-down construction to eliminate cross-lot bracing. Deep excavation of 45 feet. Design-build.
 
   Central Artery C09A4 - Tunnel Construction Excavation Support
Boston, Massachusetts
Massachusetts Turnpike Authority
Slattery Interbeton/JF White/Perini (JV)
Design and analysis for Installation of high tunnel sections on congested active site. Largest section ever jacked in the US. ACEC/MA Grand Conceptor Award.
 
   Central Artery C17A2 - I-93 State to North Streets
Boston, Massachusetts
Massachusetts Turnpike Authority
Modern Continental/Obayashi (JV)
Development of top-down construction method for 70-foot-deep, 915-foot, 8-lane tunnel section. Design of traffic decking for heavy equipment, north and south bulkhead walls.
 
 
© 1996-2009 WEIDLINGER ASSOCIATES® INC All Rights Reserved | Trademark Statement | Website by Spliteye | Printer-Friendly Page